Saratoga Springs (Utah)
24131--Council minutes24173--Planning Commission minutes
24178--Building permit files
24179--Residential building plans
AGENCY: Saratoga Springs (Utah)
SERIES: 24131
TITLE: Council minutes
DATES: 1998-
ARRANGEMENT: Chronological
ANNUAL ACCUMULATION: 1.00 cubic foot.
DESCRIPTION: These minutes are the official record of the proceedings of regularly scheduled, special and emergency council meetings. They are adopted and approved by the council during their next public meeting. The minutes include the date, time, and meeting place; members present and absent; "the substance of all matters proposed, discussed, or decided, and record, by individual member, of votes taken; the names of citizens who appeared and the substance in brief of their testimony; any other information that any member requests be entered in the minutes" in accordance with UCA 52-4-7 (1997). Also includes agendas and supporting or backup information for council items.
RETENTION
Retain permanently in office
DISPOSITION
Retain in agency custody.
FORMAT MANAGEMENT
Paper: Retain in Office permanently.
APPRAISAL
Administrative Fiscal Historical Legal
This disposition is based on Utah Municipal General Records Retention Schedule, Schedule 18, Item 23.
PRIMARY DESIGNATION
Public
AGENCY: Saratoga Springs (Utah)
SERIES: 24173
TITLE: Planning Commission minutes
DATES: 1998-
ARRANGEMENT: Chronological
ANNUAL ACCUMULATION: 1.00 cubic foot.
DESCRIPTION: These are minutes of meetings and hearings held by the planning commission. "Each municipality may enact an ordinance establishing a planning commission" (UCA 10-9-201(1)(a)(1997)). A municipal planning commission shall "prepare and recommend a general plan and amendments to the general plan; recommend zoning ordinances and maps, amendments to zoning ordinances and maps; administer provisions of the zoning ordinance; recommend subdivision regulations and amendments to those regulations; recommend approval or denial of subdivision applications; advise the legislative body of matters as the legislative body directs; hear or decide any matters that the legislative body designates, including the approval or denial of, or recommendations to approve or deny, conditional use permits; exercise any other powers that are necessary to enable it to perform or function, or delegated to it by the legislative body" (UCA 10-9-204 (1997)).
RETENTION
Retain permanently.
DISPOSITION
Retain in agency custody.
FORMAT MANAGEMENT
Paper: Retain in Office permanently.
APPRAISAL
Administrative Fiscal Historical Legal
This disposition is based on Utah Municipal General Records Retention Schedule, Schedule 20, Item 4.
PRIMARY DESIGNATION
Public
AGENCY: Saratoga Springs (Utah)
SERIES: 24178
TITLE: Building permit files
DATES: 1998-
ARRANGEMENT: Numerical by lot number
ANNUAL ACCUMULATION: 2.00 cubic feet.
DESCRIPTION: These permits are issued as official building authorization for a variety of actions (construction, demolition, the installation of plumbing, electrical or mechanical equipment, and the placement of barricades). They contain inspection requests, inspection reports, certificates of occupancy, and any pertinent information relating to the project. They may also contain water source, sewer system, flood plain, and tank certificates.
RETENTION
Retain permanently.
DISPOSITION
Retain in agency custody.
FORMAT MANAGEMENT
Paper: Retain in Office permanently.
APPRAISAL
Administrative
This disposition is based on Utah Municipal General Records Retention Schedule, Schedule 16, Item 2.
Permanent retention is based on Municipal General Schedule 16 item 2, which is based on the agency's indefinite administrative need for these records.
PRIMARY DESIGNATION
Public
AGENCY: Saratoga Springs (Utah)
SERIES: 24179
TITLE: Residential building plans
DATES: 1998-
ARRANGEMENT: Numerical by permit number
ANNUAL ACCUMULATION: 3.00 cubic feet.
DESCRIPTION: These are the blueprints and specifications submitted by building contractors or owners when applying for a building permit for the construction of residential buildings. The specifications are compiled by the architect for use by contractor to complete detail work providing type, grade, brand of materials to be used and general conditions which govern the methods to be employed. They also identify the temporary facilities, job cleanup, security, time limits, deadlines, and responsibilities of the architect, owner and contractor. They are used for determining code compliance and the enforcement of building codes. They are usually arranged by permit number or address.
RETENTION
Retain 1 year in office.
DISPOSITION
Destroy.
FORMAT MANAGEMENT
Paper: Retain in Office for 1 year after completion of construction and final inspection and then destroy.
APPRAISAL
Administrative Legal
This disposition is based on Utah Municipal General Records Retention Schedule, Schedule 16, Item 6.
PRIMARY DESIGNATION
Public